![](https://media-cdn.socastsrm.com/wordpress/wp-content/blogs.dir/2120/files/2023/04/brighton-construction.jpg)
Construction on the Municipal Parking Lot next to Sobeys will be underway until early May.
The work being done will require partial and / or temporary closures of the Municipal Parking Lot to complete repairs and upgrades.
Access to Veterans Way from Main St will be closed periodically during construction. Sections of sidewalk will be affected too. Motorists should expect traffic delays on Sanford Street and Veterans Way while storm sewers are upgraded and replaced before paving.
Parking Spots on Veterans Way and the Laneway west of Sobeys will be closed periodically.
A map of the affected area and detailed information on possible disruptions can be found at this Facebook link: https://www.facebook.com/photo?fbid=603205531843654&set=a.232905662206978.
(Written by: John Brenner)